The complaints about solar pricing are rarely about the headline figure. They are about something that appeared afterwards, was described as standard, and had not been mentioned when the price was agreed.

Most of it is avoidable with one question asked before signing, and the remainder is predictable enough to put in the projection from day one. This page lists the extras, gives each a published price range with the date it was checked, and works one household’s two quotes through with everything added back.

The question

“Please confirm in writing everything excluded from this price, and the likely cost of each if it turns out to be needed.”

An installer who has surveyed your property can answer in a paragraph. One who quoted from an aerial photograph cannot, and the difference in the answer tells you which kind of installer you are dealing with.

Legitimately excluded, and genuinely common

Consumer unit work. If your board is old, full, or lacks the right protection, it may need upgrading or a new way adding. This should be identified at survey. Discovering it on installation day means approving an extra under pressure, with the scaffold up and the crew waiting, which is the worst negotiating position in the project.

Roof repairs. An installer who finds a cracked tile, a slipped slate or a rotten batten cannot proceed as though it were sound. Reputable ones flag it and price it separately.

Long cable runs. Where the inverter must sit a long way from the consumer unit, or where the route is awkward.

Bird protection. Mesh around the array perimeter. Not always standard, cheap fitted while the scaffolding is up, and expensive retrofitted if the access has to be hired again for a job that takes an hour. There is a legal timing point too: under section 1 of the Wildlife and Countryside Act 1981, damaging or destroying the nest of any wild bird while it is in use or being built is an offence, so a retrofit after pigeons have moved in may have to wait for the nest to be finished with.

Tree work. Nobody’s installer prunes your neighbour’s oak.

Scaffolding beyond the standard. A restricted-access property, a pavement permit from the council, or scaffolding that must stand for longer than planned.

These are real costs. The question is whether they were identified at survey or discovered on the day, and the full checklist of what belongs inside a quote covers the dividing line item by item.

What the extras cost, as published

Ranges from published UK price guides, on the date shown. They are guides, not quotes: your installer’s figure for your house is the one to use, and the point of the table is to tell you whether that figure is in the normal range.

ItemPublished rangeSourceChecked
Scaffolding for a solar job£700 to £2,000, by complexitySunsave, updated 25 June 20262026-10-20
Bird proofing, standard 3 to 4 kW system£500 to £700; £300 to £1,000 for a standard home overallFuse Energy, updated 18 October 20262026-10-20
Consumer unit, standard dual-RCD board up to 10 circuits£450 to £700 outside London, £700 to £950 in LondonFantastic Services, 2026 guide2026-10-20
Consumer unit, RCBO board with surge protection£550 to £800 outside London, £850 to £1,100 in LondonFantastic Services, 2026 guide2026-10-20
Replacement 5 kW hybrid inverter, unit only£899.99 including VAT, one retailer’s listingEco Wizard2026-10-20

Roof repairs, long cable runs and tree work are left out deliberately: they depend entirely on what the survey finds, and no published range would mean anything for your roof.

Should not be extra

Be more sceptical about:

  • A charge for the certification itself, separate from the installation.
  • A charge for the network operator notification, which is administrative.
  • A separate “commissioning fee” on top of installation labour.
  • Removal of packaging and waste.
  • VAT on the qualifying work, which is zero rated until 31 March 2027: a “plus VAT” surprise on the invoice is not a hidden cost, it is an error to challenge.

None are unusual costs. Seeing them itemised as additions usually means the headline price was set low to win a comparison, which is the signature move of the cheapest quote.

Comparing quotes honestly

Once you have the exclusions from each installer, add the likely extras back on before comparing. A quote including scaffolding, bird protection and a consumer unit upgrade may well be cheaper than one excluding all three that looked lower.

A worked household: two quotes for ten panels

A south facing house using 3,600 kilowatt hours a year, the household from the ten panels and a battery example, gets two quotes for ten 440 watt panels, 4.4 kilowatts peak. On that example’s figures the array saves about £650 a year in today’s money.

  • Quote X, £7,470, with scaffolding, bird mesh and any consumer unit work written in. That is £1,698 per kilowatt peak, level with the DESNZ 2025/26 median of £1,697 for 4 to 10 kW systems. Simple payback about 11.5 years.
  • Quote Y, £6,600, excluding scaffolding and bird mesh, with “consumer unit upgrade if required” as a note. That is £1,500 per kilowatt peak, about 12% under the median, and a payback of about 10.1 years. It looks like the better deal.

Now add back the extras at the bottom of the published ranges, which is generous to Quote Y:

  1. Scaffolding at £700: £7,300.
  2. Bird mesh at £500: £7,800, or £1,773 per kilowatt peak, about 4.5% over the median. Payback about 12.0 years.
  3. If the survey Quote Y never did finds the board needs replacing, a standard dual-RCD board at £450: £8,250, or £1,875 per kilowatt peak, about 10.5% over the median. Payback about 12.7 years.

The quote that was £870 cheaper on paper ends up £330 dearer with two exclusions added back, and £780 dearer with three. Nothing about the panels changed. The widget below starts on Quote Y’s adjusted £7,800; type in each quote’s own total with its extras added and compare the last row.

Try the numbersSize, generation and your quote against the median
440 W
10
£7,800
System size
4.4 kWp
Year one generation
3,740 kWh
DESNZ band, 4 to 10 kW
£1,697 per kW median
Median cost for this size
£7,467
Your quote per kWp
£1,773
Against the median
+4.46%
Assumptions
  • 850 kWh per kW a year for a south facing roof (the site model's figure, not a measurement), scaled by the calculator's direction factors shown in the list.
  • Pitch and shading are not modelled here. For a roof-specific figure use PVGIS, which is free, or the MCS estimate on the quote.
  • Medians are the DESNZ median installed cost per kW, 0 to 4 kW (£1,780) and 4 to 10 kW (£1,697), 2025/26 edition, published 28 May 2026, confirmed against the spreadsheet 2026-10-19. No larger domestic band is published.
  • The quote starts at the median for the size shown, so the comparison reads zero until you enter your own total. 440 W per panel is the posts' worked figure; use the wattage on your quote.

Illustrative arithmetic on the inputs shown. For a projection with degradation, replacement and your tariff, use the calculator.

The sequencing of the bird mesh matters as well. Fitted while Quote X’s scaffold is up, it is part of a £7,470 price. Retrofitted a year later on a house where the access needs scaffolding again, the same mesh carries at least the £700 scaffold floor on top of its own £500, and £1,200 spent to save a job that would have taken an hour on the day.

Divide the adjusted total by the system size, compare cost per kWp, and hold the results against the government’s medians, £1,780 per kilowatt for systems up to 4 kW and £1,697 for 4 to 10 kW in 2025/26, so the comparison has an anchor no salesperson controls.

What the quote will say

Price includes all standard installation. Scaffolding, bird protection and electrical upgrades, if required, will be quoted separately.

“If required” is the phrase to take apart. Ask whether the installer has seen the roof and the consumer unit, and if so whether each item is required, yes or no. If they have not, ask for the price of each in writing now, and add all of them to the total before you compare it with anything. An installer who will not put a number on scaffolding for a house they are quoting to install on is telling you the number will be decided after you have signed.

The ones that arrive later

Not on any quote, and they belong in your projection.

Inverter replacement. Inverter design life is shorter than panel design life, and the lifespan post sets out why the inverter, not the panels, usually sets the first replacement cost. One retailer listed a 5 kW hybrid unit at £899.99 on the date checked, before labour: on the worked household’s £650 a year, the unit alone is about 1.4 years of savings. A savings table containing no inverter replacement is understating costs exactly where the totals grow.

Battery replacement, if you have storage and the projection runs long enough, with capacity declining on the way there.

Occasional cleaning, depending on pitch, tree cover and local conditions, with monitoring as the free early-warning system.

A new EPC, if you want the rating updated to reflect the installation, since the certificate does not update itself.

Buildings insurance notification. Most policies expect to be told about the installation. The premium effect is usually small; the consequence of an unnotified claim dispute is not. One phone call.

The sequencing cost people miss

If your roof will need work within a few years, do the roof first.

Removing and refitting an array so tiles underneath can be replaced means paying for scaffolding, panel removal, storage and reinstallation, to end up exactly where you started. At the £700 to £2,000 scaffolding range alone, before any labour on the panels, it is the single most expensive mistake in this category, and it is entirely avoidable: ask how old the covering is and what remains of its life before you order anything, and if the answer is less than the system’s payback period, sequence the work.

Deposits and payment terms

Not line items, and part of the price.

A modest deposit is normal. A very large one shifts risk onto you for work not yet done. Ask what protection applies to your deposit, under which consumer code, RECC being the sector’s largest, and confirm it independently rather than taking it from the salesperson.

Payment on completion and commissioning is a different proposition from payment on delivery of materials, and the difference is who carries the risk of the gap between those two dates. Read which one you are signing.

Questions people ask

Is scaffolding always extra?

No, and in a good quote it is not: it is a line inside the total, because every pitched roof install needs safe access. Published guides put it at £700 to £2,000 depending on the house. When one quote includes it and another excludes it, add the excluded figure back before comparing, as the worked example does, and the second quote’s other differences then show up on equal terms.

Do I need a new consumer unit for solar panels?

Not always. The survey decides it: an old board, a full board or one without the protection the new circuit needs is the usual reason. Published guides price a standard dual-RCD board at £450 to £700 outside London. The test of a quote is whether the installer has looked at your board and said yes or no, rather than writing “if required”.

Is bird proofing worth paying for?

Where pigeons are a local problem, fitting it with the panels is cheap relative to the alternative: about £500 to £700 for a standard system on one published guide, against a retrofit that may need its access hired again and cannot disturb an active nest. Where they are not, it is a reasonable thing to decline, and the maintenance routine will show you if that changes.

Should the inverter replacement be in my payback sum?

Yes. It is a predictable cost inside a twenty five year projection, and leaving it out flatters every year after it. The calculator includes it, in today’s money, which is one reason its payback can read longer than a quote’s.

Check your own numbers

Take each quote’s total with its exclusions added back at the figures the installer gives you in writing, divide by the kilowatts peak, and put the adjusted total through the projection: the hidden costs, once found, are just costs, and a system that pays back with all of them counted is the only kind worth buying. The calculator runs the year by year version with degradation and the inverter replacement in it. Start from the worked household’s ten panels: open the calculator with the worked example loaded.

Next: reading a quote line by line, and the rest of the cost guides. If you still need businesses to quote, our installer directory lists Google’s listings near a postcode; check each one’s MCS status on the register.

Sources

  • Sunsave, Scaffolding for solar panels: costs and tips, last updated 25 June 2026: £700 to £2,000. Checked 2026-10-20, sunsave.energy.
  • Fuse Energy, Solar panel bird proofing in the UK, updated 18 October 2026: £300 to £1,000 for a standard home, £500 to £700 for a typical 3 to 4 kW system. Checked 2026-10-20, fuseenergy.com.
  • Fantastic Services, Fuse box replacement cost guide, 2026: prices by board type, outside London and in London. The page shows no update date. Checked 2026-10-20, fantasticservices.com.
  • Eco Wizard, Inverters listing: Sungrow 5 kW single phase hybrid inverter at £899.99 including VAT. Checked 2026-10-20, ecowizard.co.uk.
  • Wildlife and Countryside Act 1981, section 1(1)(b): the offence of damaging or destroying a wild bird’s nest in use or being built. Checked 2026-10-20, legislation.gov.uk.
  • Department for Energy Security and Net Zero, Solar PV cost data, 2025/26 edition published 28 May 2026: medians of £1,780 per kilowatt (0 to 4 kW) and £1,697 (4 to 10 kW). Checked 2026-10-19, gov.uk.
  • HMRC, VAT Notice 708/6: zero rate on qualifying energy-saving materials to 31 March 2027. Checked 2026-10-19, gov.uk.
  • gowith.solar, Ten panels and a battery, for the household’s £650 a year solar saving, ten panels and a battery.
  • The two quotes, the choice of the lowest published figure for each extra and the quote box are illustrations, labelled as such.