The cost of fitting solar panels: what is in the quote and what is not
Scaffolding, network applications, bird proofing, isolators. The line items that turn up late, and the ones a good quote states up front.

Explore this decision
Solar installation cost calculator: add up your quote
Break down entered panel, equipment, installation and access costs for a solar quote.
Each amount is entered once on a consistent VAT basis.
Most complaints about solar pricing are not about the headline figure. They are about something that appeared afterwards, was described as standard, and had not been mentioned when the price was agreed.
The fix is to ask for the exclusions in writing before you sign. Here is what to ask about, which of these are legitimate extras rather than padding, and the checks that cost nothing but catch the expensive problems: certification, grid paperwork, VAT treatment and deposit protection.
Always included in a competent quote
- The panels, mounting system and inverter, each identified by manufacturer and model rather than “tier one panels”.
- Installation labour and commissioning.
- Scaffolding, in almost all cases.
- The network operator notification or application.
- MCS registration and the certificate.
- The handover pack, warranties and monitoring setup.
If any of those is absent, that is not a cheaper quote. It is an incomplete one, and the difference will arrive later.
The certification line deserves a moment, because it is the one with money attached. Export tariffs under the Smart Export Guarantee require the installation to be certified under MCS or an equivalent scheme, and suppliers check before they register you. An uncertified install can therefore lock you out of export income for as long as you own it. You can check any installer’s registration yourself on the MCS register before you sign, which takes two minutes and filters out the worst outcome available in this market.
The grid paperwork, decoded
Every grid connected system involves the local network operator, and the quote should say which of two routes applies, because one of them affects your timeline:
- G98 covers systems up to 16 amps per phase, which is 3.68kW of inverter capacity on a single phase supply. The installer fits the system first and notifies the network operator within 28 days. No fee, no waiting.
- G99 applies above that. The application goes in before installation and the network operator must approve it, which typically adds weeks and can occasionally require network reinforcement discussions.
Two things follow. A quote for a larger system that promises next week’s installation date without mentioning G99 has skipped a step you will pay for in delay. And a system sized at exactly 3.68kW of inverter may have been sized to the paperwork rather than to your roof, which is worth a direct question: what would the price and timeline be for the size my roof can actually take? The difference matters over twenty five years, as the worked example on 4kW system costs shows.
Commonly excluded, and legitimately so
Consumer unit work. If your board is old, full, or lacks the right protection, it may need upgrading. A surveyor can tell you before the day. Ask.
Roof repairs. An installer who finds a cracked tile or rotten batten cannot proceed as though it were sound. Reputable ones flag it and price it separately rather than absorbing it silently.
Bird protection. Mesh around the array edge stops pigeons nesting underneath. It is not always specified as standard, it is much cheaper fitted at the same time as the panels, and retrofitting means paying for scaffolding twice.
Long cable runs. Where the inverter has to sit a long way from the board.
Tree work. Nobody’s installer prunes your neighbour’s oak.
These are real costs, not invented ones. The question is whether they were identified at survey or discovered on the day.
Things that should not be extra
Be more sceptical about:
- A charge for the MCS certificate itself, separate from the installation.
- A charge for the G98 notification, which is administrative.
- A “commissioning fee” on top of installation labour.
- Removal of packaging and waste.
None of these are unusual costs. Seeing them itemised as additions is usually a sign the headline price was set low to win the comparison.
VAT: the check that takes ten seconds
The installation of energy saving materials in residential accommodation, including solar panels, is zero rated for VAT from 1 May 2023 to 31 March 2027, after which it reverts to the reduced rate of 5%. Battery storage qualifies too, including batteries retrofitted on their own, from 1 February 2024. The rules are in HMRC’s VAT notice 708/6.
The practical check: a domestic supply-and-install quote today should carry no VAT on the qualifying work. If it shows 20%, ask why. Mixed jobs, where non-qualifying work such as general roof repair is done at the same time, can legitimately have a mixed treatment, and a good quote will show which line is which rather than blending them.
The widget shows what the three rates do to one price. On the median 4kW system the difference between the zero rate and a wrongly applied 20% is over £1,400, which is more than most of the exclusions on this page put together.
- Qualifying domestic installations are zero rated to 31 March 2027, then at the reduced rate of 5% from 1 April 2027, per HMRC Notice 708/6.
- The 20% column is the standard rate, for work that does not qualify, or a quote that has applied VAT it should not have.
- Mixed jobs can carry mixed treatment: non-qualifying work such as general roof repair done at the same time is charged at its own rate. This shows one price at one rate.
- The default price is the 4 kW system at the DESNZ 0 to 4 kW median; enter the ex-VAT figure from your own quote.
Illustrative arithmetic on the inputs shown. For a projection with degradation, replacement and your tariff, use the calculator.
The checks on one table
Every check on this page, with the figure or rule it rests on and the date it was last looked at, because every one of them can change.
| Check | Rule or figure | Source | Checked |
|---|---|---|---|
| Export eligibility | Certification under MCS or an equivalent scheme is required for Smart Export Guarantee payments | Ofgem, SEG | 2026-10-19 |
| Installer registration | Searchable on the MCS register before you sign | MCS | 2026-10-19 |
| Grid route | G98 up to 16 A per phase (3.68kW single phase), notify within 28 days; G99 above that, approval before installation | Energy Networks Association | 2026-10-19 |
| VAT on qualifying work | 0% to 31 March 2027; 5% from 1 April 2027; batteries included from 1 February 2024 | HMRC Notice 708/6 | 2026-10-19 |
| Deposit protection | Through the consumer code the installer belongs to; MCS requires membership of one | RECC | 2026-10-19 |
| Price sanity | DESNZ 2025/26 medians: £1,780 per kW (0 to 4kW), £1,697 per kW (4 to 10kW) | DESNZ cost data | 2026-10-19 |
The exclusions question
There is one question that surfaces most of this at once:
“Please confirm in writing everything that is excluded from this price, and what the likely cost would be if it turned out to be needed.”
A surveyor who has looked at your roof and your consumer unit can answer that in a paragraph. One who quoted from an aerial photograph cannot, and the answer will tell you which you are dealing with.
What the quote will say
4kW solar PV system, supplied and installed: £6,300. Scaffolding, electrical upgrades and bird protection charged if required.
Read that second sentence as the price of the first. “If required” is not a probability; the surveyor already knows whether your consumer unit needs work and whether the array edge will be open to pigeons. A quote that defers the known extras to the day is quoting a different, lower job than the one that will be done, and the comparison with a complete quote is only fair once the deferred items are added back.
Payment terms are part of the price
Two things worth checking that are not line items:
Deposit size. A modest deposit is normal. A very large one shifts risk onto you for work not yet done.
What the payment schedule is tied to. Payment on completion and commissioning is different from payment on delivery of materials.
Deposit and workmanship protection come through the consumer code your installer belongs to: MCS requires membership of one, and RECC is the largest. Check which code your installer belongs to and what its deposit protection actually covers, rather than assuming the word “protected” on the quote does the work.
Compare like with like: a worked adjustment
Once you have the exclusions from each installer, add the likely extras back onto each quote before comparing. An illustration with two quotes for the same nominal 4kW system:
- Quote A: £7,400, including scaffolding, bird protection and a consumer unit upgrade the surveyor identified.
- Quote B: £6,300, excluding all three. Add realistic figures for the same three items once they arrive as extras and the adjusted total lands above Quote A, with the work now negotiated from a weaker position, after the scaffolding is already up.
The adjusted total, divided by system size in kilowatts peak, is the figure to judge, and you can hold it against the government’s published medians for what solar installations actually cost rather than against advertising. Quote A at 4kW is £1,850 per kilowatt, about 4% above the 0 to 4kW median, which a consumer unit upgrade explains on its own. Quote B’s £1,575 per kilowatt is about 12% below it, which is the gap the three missing items are about to fill.
Then judge that adjusted cost against what the system will actually save on your usage and your tariff, rather than against the savings figure the quote came with. Installer projections routinely assume rising energy prices; our calculator deliberately does not, so you can see the return in today’s money.
Questions people ask
Can I claim the VAT back if the installer charged 20%?
The zero rate is applied by the installer on the invoice; it is not a rebate you claim afterwards. If a quote shows 20% on qualifying domestic work, the time to fix it is before you sign, by asking the installer to re-issue it under Notice 708/6. After payment, the correction is between you and the installer’s accounts, which is a slower and less certain conversation.
Is scaffolding ever genuinely optional?
Occasionally, on a low single storey roof reachable with a tower or from a flat roof, and the installer will say so and price the access they are using instead. On a typical two storey house it is not optional, it is priced by the property rather than the system, and a quote that leaves it out has left out one of the larger lines in the full cost breakdown.
What if the installer says G99 is not needed for a 5kW array?
They may be right, if the inverter is limited to 3.68kW and the array is oversized behind it, which is a common and legitimate design. Ask for the inverter’s rating in writing and which route the paperwork will take. If the inverter is above 3.68kW on a single phase supply, G99 applies and the timeline should reflect it.
How large a deposit is reasonable?
Small enough that the balance of the money follows the balance of the work. The consumer codes set rules on deposits and on how they are protected, and the installer’s code membership is the thing to check rather than the adjective on the quote. A deposit that is most of the price, paid before anything arrives, is a risk you are carrying for the installer, not a discount.
Check your own numbers
Put each adjusted quote through the ROI calculator with your own usage and rates, and compare paybacks instead of totals. Start from a 4kW system at the median and change the occupancy answer first: open the calculator with the worked example loaded.
Next: why two quotes for the same roof differ, reading a quote line by line, and the rest of the cost guides. If you still need businesses to quote, our installer directory lists Google’s listings near a postcode; check each one’s MCS status on the register.
Sources
- HMRC, VAT on energy-saving materials and heating equipment, Notice 708/6: the zero rate from 1 May 2023 to 31 March 2027, 5% from 1 April 2027, batteries from 1 February 2024. Checked 2026-10-19, gov.uk.
- Ofgem, Smart Export Guarantee, the certification requirement. Checked 2026-10-19, ofgem.gov.uk.
- MCS, the installer register. Checked 2026-10-19, mcscertified.com.
- Energy Networks Association, Connect my generation, the G98 and G99 routes. Checked 2026-10-19, energynetworks.org.
- RECC, the Renewable Energy Consumer Code. Checked 2026-10-19, recc.org.uk.
- Department for Energy Security and Net Zero, Solar PV cost data, 2025/26 edition published 28 May 2026, medians of £1,780 (0 to 4kW) and £1,697 (4 to 10kW) per kilowatt, confirmed against the DNC basis spreadsheet. Checked 2026-10-19, gov.uk.
- The two quotes in the worked adjustment are illustrations, not real quotes.
Related
- What a 4kW solar system actually costs in 2026The most common domestic size, priced from government installation data, with a worked savings example and the reasons the price band is wide.
- What the solar ROI calculator actually modelsA plain description of what goes into the payback figure, what it leaves out, and why a single headline number is never the whole story.
- Why two solar quotes for the same roof differ by thousandsPanel count, inverter class and margin you cannot see. How to normalise two quotes so the remaining difference means something.