How to choose a solar installer

Six checks that separate a surveyed quote from a templated one, none of which are about price.

10 min readpattern
Illustration accompanying How to choose a solar installer

The equipment is mature and the physics is settled. What varies between installers is the quality of the survey, the honesty of the generation estimate and the standard of the roof work. None of those show up in the price, and all of them can be tested from your kitchen table with the six checks below.

One: did they actually survey?

Someone should have visited, got near the roof, looked in the loft and opened your consumer unit.

A quote produced from an aerial photograph and a phone call cannot know your rafter spacing, your roof covering’s condition, whether your board has a spare way, or what the chimney shades in December.

If nobody came, the quote is an estimate wearing a quote’s clothes, and every downstream number inherits the guesswork.

Two: where did the generation figure come from?

Every quote carries an annual generation estimate, and every savings figure is downstream of it. An estimate ten per cent high makes the payback look ten per cent better than it will be.

Ask which modelling tool produced it, whether shading was measured or assumed, and what degradation rate is applied. There is a right answer available: certified installers are required to produce the figure by the MCS estimation method, postcode irradiance, orientation, pitch and a shading assessment, so “the MCS standard method, here is the shading survey” is what competence sounds like. You can also cross-check any figure yourself in the European Commission’s PVGIS tool in five minutes.

An installer who surveyed properly answers immediately and specifically. One who cannot is quoting from a template.

Three: what self-consumption rate did they assume?

The most influential number in the projection and the one least likely to be stated.

Move it from a low figure to a high one and payback shifts by years with nothing physical changing. Ask what was assumed and why that figure describes your household.

If the answer is a round number with no reference to your occupancy or your consumption, the savings figure is generic.

Four: what is excluded?

Get it in writing:

“Please confirm everything excluded from this price, and the likely cost if it turns out to be needed.”

Scaffolding, consumer unit work, roof repairs, bird protection, long cable runs: the full checklist of what belongs inside a quote covers which exclusions are legitimate. An installer who has looked at your property can answer in a paragraph. One who has not will be vague, and the gaps arrive as extras on the day the scaffold is already up, when your negotiating position is at its weakest.

While you are asking, add one more: which grid connection route applies, G98 notification or a G99 application, and whether the timeline in the quote reflects it. An installer promising next week for a system that needs prior G99 approval has already told you about their paperwork.

Five: check the certification independently

Do not accept a logo on a PDF. Search the MCS register by company name or registration number.

Confirm the business is currently certified, and certified for the specific technology you are buying. Certification is per technology: solar photovoltaic registration does not cover battery storage or heat pumps, and a package quote needs cover for all of it.

This matters commercially as well as technically. Export payments under the Smart Export Guarantee require MCS or equivalent certification, so an uncertified installation removes a few hundred pounds a year of projected return for as long as you own it. Check the consumer code too: MCS installers must belong to one, RECC is the largest, and the code’s deposit protection is the part of “fully insured and accredited” you can actually verify.

To find installers near you to put through these checks, our installer directory lists Google’s listings by distance from a postcode: Google data, so check MCS yourself.

Six: who does the roof work?

Ask whether the roof crew are employed or subcontracted, and how long they have worked together.

This is where installations go wrong. Water ingress at the mounting penetrations is the failure that ruins a roof, and it is a workmanship problem rather than an equipment one. Subcontracting is normal and not a red flag; not knowing who is coming is.

Also ask what happens if a slate breaks. The right answer is that they carry replacements and expect some breakage. The wrong answer is that it does not happen.

The six checks as a sequence, with the pounds attached

The order matters: each check is cheapest before the one after it, and each has a figure behind it.

  1. Find candidates and filter on the register. Three or four businesses from the directory or a recommendation, each confirmed on the MCS register for solar PV (and batteries, if quoted). The filter protects the export line: about £240 a year on 2,000 exported kilowatt hours at Octopus Outgoing’s 12p, for as long as you own the system.
  2. Insist on a survey before a price. No survey, no quote worth reading; the survey is what the exclusions and the generation estimate both rest on.
  3. Normalise the quotes. Divide each by its kilowatts and hold it against the DESNZ medians of £1,780 (0 to 4kW) and £1,697 (4 to 10kW) per kilowatt for 2025/26. A 4kW quote at £7,400 is £1,850, about 4% over; at £6,300 it is £1,575, about 12% under and probably missing something.
  4. Add the exclusions back. Then divide again. A quote that was 12% under its median rarely stays there.
  5. Check the generation estimate and the self consumption share. The method, the shading assessment, and the share: moving the share from three quarters to half on a 4kW array at the October to December 2026 cap of 26.32p takes the saving from about £773 to about £651 a year, which on the £7,120 median price is the difference between a nine year payback and an eleven year one.
  6. Ask who does the roof, and what happens to a broken slate. The check with no figure attached, and the one that decides whether the roof is dry in ten years.

What the quote will say

Award-winning, fully accredited installer. Over 1,000 installations. 25 year warranty. Book now for this month’s price.

None of that is one of the six checks. Awards and installation counts are unverifiable from your kitchen table; “fully accredited” is one register search; a 25 year warranty is the panels’ performance warranty wearing the installer’s name, and the workmanship warranty, the one that depends on the company still trading, is the number to ask for. “This month’s price” is the sales technique below. Ask the six questions and the brochure answers itself.

What not to weight heavily

Panel brand. Gets disproportionate sales attention and rarely decides whether an installation pays. The datasheet warranty terms are the checkable part; the adjectives are not.

Company size. A national firm carries a sales force and a marketing budget; a two-person local outfit carries neither. Larger may mean a stronger warranty covenant, or may mean you are funding advertising. Judge the six points above instead, and judge the price per kilowatt peak against the published medians rather than by the size of the brochure.

A discount for signing today. Solar pricing is not volatile week to week, and the government’s cost data shows a stable, gently falling market: the small-system median fell from £1,884 per kilowatt in 2024/25 to £1,780 in 2025/26. An offer that expires when the salesperson leaves your kitchen is a sales technique, and it is the single most reliable signal on this page: competent, busy installers do not need it.

Questions people ask

How do I find installers near me?

A recommendation from someone whose roof you have seen is the best start; after that, our installer directory lists Google’s listings by distance from a postcode. It is Google’s data, it carries no MCS status of its own, and it is a list rather than a recommendation, so every name on it goes through the register and the six checks like any other.

Should I pick the cheapest of three quotes?

Only after normalising them: per kilowatt, with exclusions added back, against the published medians. The cheapest total is often the smallest system or the one with the most left out, and the method for making three quotes comparable usually moves the cheapest quote off the bottom of the list.

Is a national installer safer than a local one?

Neither is safer by category. What matters is the consumer code behind the deposit, the workmanship warranty’s terms, and who is on the roof; a national firm may have a stronger covenant and a local one a better crew, and the six checks test both the same way. The brochure’s size is not one of the checks.

What if the installer refuses to show the shading assessment?

Then the generation estimate has no basis you can see, and every figure after it inherits that. The MCS method requires a shading assessment, so a certified installer has one; an installer who will not show it has either not done it or does not want you to see what it says. Either way the quote is a template, and the next installer on the list is the right move.

Then bring your own numbers

The strongest position in any of these conversations is your own estimate of what the system will save, built from your consumption, your tariff and a conservative generation figure: the twenty minute method produces it, and the calculator extends it across twenty five honest years.

With that in hand, the quote’s savings number stops being a claim you have to accept and becomes something you can reconcile against your own working, and the installer who welcomes that conversation is usually the one to hire.

Check your own numbers

The honest next step is two lists, not one. The installer directory gives you names near your postcode to put through the six checks, with Google’s data and nothing promised about any of them. The calculator gives you the figure to hold every quote against, in today’s money, with degradation and an inverter replacement included: open the calculator with the worked example loaded.

Every step from survey to switch-on is collected in buying and installing solar panels.

Sources

  • MCS, the certification scheme, its estimation method and the installer register. Checked 2026-10-19, mcscertified.com.
  • European Commission, PVGIS. Checked 2026-10-19, re.jrc.ec.europa.eu.
  • Ofgem, Smart Export Guarantee, the certification requirement. Checked 2026-10-19, ofgem.gov.uk.
  • Octopus Energy, Smart Export Guarantee: Outgoing at 12p. Checked 2026-10-19, octopus.energy.
  • RECC, the Renewable Energy Consumer Code. Checked 2026-10-19, recc.org.uk.
  • Department for Energy Security and Net Zero, Solar PV cost data, 2025/26 edition published 28 May 2026: medians of £1,780 (0 to 4kW) and £1,697 (4 to 10kW) per kilowatt, and the 2024/25 small-system median of £1,884, confirmed against the DNC basis spreadsheet. Checked 2026-10-19, gov.uk.
  • Ofgem, Changes to the energy price cap between 1 October and 31 December 2026: 26.32p per kWh. Checked 2026-10-20, ofgem.gov.uk.
  • Energy Networks Association, Connect my generation, the G98 and G99 routes as cited across this site; the page blocked automated checking on 2026-10-19, so the figures are as previously cited, energynetworks.org.
  • The quote box and the £7,400 and £6,300 quotes are illustrations, labelled as such.