gowith.solar

Solar panel installation cost breakdown

Where the money actually goes: hardware, labour, scaffolding, certification and margin, and which of those scale with system size.

10 min readcalculation
Illustration accompanying Solar panel installation cost breakdown

Explore this decision

See how in-roof and on-roof solar are built

A construction cutaway makes the differences visible. Actual mounting systems, flashings and ventilation details vary by manufacturer and roof.

The model is schematic, not a construction detail or a specification.

Open in-roof versus on-roof solar on its own page

Explore this decision

How much could replacing solar panels cost?

Enter your own itemised figures to see how panel and associated costs add up.

Enter each cost once on a consistent VAT basis. Starting figures are illustrative, not prices or quotes.

Open panel replacement cost on its own page

Understanding where the money goes in an installation does two useful things. It tells you which parts of a quote are negotiable, and it explains why the economics improve as the system gets larger.

The structural insight is this: a substantial share of the cost does not scale with system size. Once you see which parts those are, several pricing puzzles resolve themselves, including the one visible in the government’s own numbers: the DESNZ installation cost data puts the 2025/26 median at £1,780 per kilowatt for systems up to 4kW but £1,697 for 4 to 10kW systems. Bigger is cheaper per unit, and the fixed costs below are the reason.

The parts that scale with size

Panels. More capacity means more modules, roughly linearly. Panel prices have fallen a long way over the last decade, so this is a smaller share of the total than most people assume.

Mounting hardware. Rails, brackets and clamps, proportional to panel count.

Installation labour on the roof. More panels take longer to fit, though not proportionally, since setting up and packing down are fixed.

DC cabling. Modest, and proportional to array size.

That is roughly it. Everything below is largely fixed.

The parts that do not scale

Scaffolding. Priced by the property and the access, hired for the duration. A four panel system and a sixteen panel system on the same house need much the same scaffold.

The survey and design. Someone visits, measures, assesses shading and produces a specification. Same effort either way.

Certification and registration. A fixed administrative cost per installation, and the item whose absence costs you export payments, so it is fixed but not optional.

Network operator paperwork. Fixed, and it interacts with sizing: up to 3.68kW of inverter on a single phase the installer simply notifies the network operator within 28 days under G98, while larger inverters need a G99 application approved first. Some installers price and size to stay under the line; the paperwork is cheaper than the capacity it costs you.

The inverter, in steps rather than smoothly. One inverter covers a range of array sizes, so within that range adding panels adds no inverter cost at all. Cross the boundary and it steps up.

Consumer unit work and the AC side. Largely independent of array size.

Mobilisation. Getting a team and a van to your house for a day.

VAT. Zero on the whole qualifying installation until 31 March 2027, so it should be absent from the breakdown entirely, at any size.

Why this makes larger systems better value

Put illustrative numbers on it. Suppose £2,500 of a job is fixed: scaffolding, survey, certification, mobilisation, the AC side. On a 3kW system that fixed block is over £800 per kilowatt before a single panel is paid for. On a 6kW system it is around £415. The medians above show the effect in real data, and the same logic is why bedroom-table pricing misleads: the tables scale the whole price with size when only part of it scales.

The same fixed block on four sizes

The illustrative £2,500 spread over the capacity, beside what the DESNZ median for each size’s band implies the whole job costs. The fixed block is an illustration; the medians are the published figures.

SystemFixed block per kW (illustrative £2,500)Band median per kWMedian cost for the size
3kWabout £833£1,780about £5,340
4kWabout £625£1,780about £7,120
6kWabout £417£1,697about £10,180
10kW£250£1,697about £16,970

Read the second column against the third: on the smallest system the fixed block is nearly half the median rate before any panel is bought, and on the largest it is about a seventh. The step from the 0 to 4kW median to the 4 to 10kW median, £83 per kilowatt, is the published trace of that arithmetic.

The widget prices any size at its band’s median and holds a quote against it; set the panel count to the quote’s and the total to the quote’s, and the comparison reads in pounds per kilowatt.

Try the numbersSize, generation and your quote against the median
430 W
14
£10,200
System size
6.02 kWp
Year one generation
5,117 kWh
DESNZ band, 4 to 10 kW
£1,697 per kW median
Median cost for this size
£10,216
Your quote per kWp
£1,694
Against the median
-0.16%
Assumptions
  • 850 kWh per kW a year for a south facing roof (the site model's figure, not a measurement), scaled by the calculator's direction factors shown in the list.
  • Pitch and shading are not modelled here. For a roof-specific figure use PVGIS, which is free, or the MCS estimate on the quote.
  • Medians are the DESNZ median installed cost per kW, 0 to 4 kW (£1,780) and 4 to 10 kW (£1,697), 2025/26 edition, published 28 May 2026, confirmed against the spreadsheet 2026-10-19. No larger domestic band is published.
  • The quote starts at the median for the size shown, so the comparison reads zero until you enter your own total. 440 W per panel is the posts' worked figure; use the wattage on your quote.

Illustrative arithmetic on the inputs shown. For a projection with degradation, replacement and your tariff, use the calculator.

Two practical conclusions:

Very small systems have poor economics. The scaffolding and paperwork dominate. This is worth knowing if you are considering a token installation: two panels ride on the same scaffold as twelve.

Undersizing is expensive. If your roof and your consumption support more capacity, the marginal panel, added to a job already happening, costs little more than the panel and the labour to clip it on, and buying it later means paying the fixed costs a second time. The worked 4kW example shows what the resulting capacity earns.

A second worked job: the retrofit that pays the block twice

A household fits 4kW now at about £7,120 and adds 2kW three years later. The second job has its own scaffold, survey, certification and mobilisation: the illustrative £2,500 again, plus the panels and the labour, and possibly a larger inverter if the first was sized tightly. The two jobs together cost comfortably more than the 6kW job’s median of about £10,180 would have, because the fixed block was paid twice for the same roof. If the extra consumption that justifies the 2kW is coming within a couple of years, a car, a heat pump, a home worker, the cheaper route is to fit the capacity while the scaffold is up, which is also the 6kW article’s conclusion from the saving side.

Where roof type changes the number

Labour is where your specific property shows up:

  • Concrete tile is the quickest common covering to work with.
  • Slate is slower and more fragile. Breakages are expected and replacement slates must be sourced.
  • Clay sits between the two, and older clay is brittle.
  • Metal and flat roofs need different mounting approaches entirely.
  • Steep or high roofs slow everything down.
  • Restricted access raises scaffolding cost and sometimes needs a permit for the pavement.

None of this appears on a price list, and all of it is why a phone quote is not a quote, and why the honest spread around the national medians is as wide as it is.

What margin looks like

Every business has overhead and profit. A national installer with a sales force, a call centre, a marketing budget and a warranty reserve carries costs a small local firm does not.

That does not make either wrong. It means you should know what you are buying: a stronger covenant behind the workmanship warranty has value, and so does a lower price. What you should not do is assume the difference is pure profit without asking, and the consumer code protections behind each firm are checkable rather than takeable on trust.

What the quote will say

Solar PV installation, 4 kW: £7,400. Includes panels, inverter, mounting, installation and commissioning.

What it does not say is which of the fixed items are inside that figure. Scaffolding, the network notification, MCS registration and any consumer unit work are the lines that arrive later if they are not named now, and they are the lines that do not shrink with the system. Ask for the quote with each fixed item listed, included or excluded with a price, and then divide by the kilowatts: £7,400 over 4kW is £1,850, about 4% above the median, before any excluded item is added back.

Using the breakdown when comparing

Take each quote and estimate, roughly, how much sits in fixed costs and how much in per panel costs. Then compare cost per kilowatt peak, against each other and against the published medians.

If one quote is much higher on a per kilowatt basis for a similar specification, ask directly what accounts for it. A genuine answer names something specific: a harder roof, a better inverter, per panel electronics for shading, a longer cable run, the usual suspects behind honest quote gaps. A vague answer about quality is telling you the difference is margin.

Questions people ask

How much of the price is the panels?

A minority, on most jobs today. Panel prices have fallen for a decade while scaffolding and labour have not, so the fixed block and the installation day are the larger share. That is why the medians fall per kilowatt as systems grow and why a quote’s panel brand matters less to the price than its roof, its access and its inverter.

Is scaffolding really the same for any size?

For a given roof, close to it: the scaffold is priced by the property and the duration, not by the panel count, and a sixteen panel array on one pitch uses the scaffold a four panel array does. Two pitches, or a roof over a conservatory, change the scaffold; two more panels do not.

Why does the inverter cost step rather than scale?

Because one inverter covers a range of array sizes. Within that range adding panels adds nothing on the AC side; cross its rating and the next model up is a step in price, and on a single phase supply crossing 3.68kW of inverter also changes the network route from G98 notification to a G99 application. The step is why many quotes pair a larger array with a 3.68kW inverter and accept some clipping.

Does the breakdown change on a slate roof?

The fixed block is the same; the roof labour is not. Slate is slower, breakages are expected and replacements must be sourced, so the per panel labour line rises and so does the total. The breakdown tells you where the premium sits, which is the right place for it; a slate quote at the concrete tile price has usually not priced the breakages.

Check your own numbers

The breakdown tells you whether the price is fair; only the projection tells you whether the purchase is sound. Put your consumption and your tariff in rather than the savings figure that came attached, and compare the 4kW and 6kW sizes on the same household: open the calculator with the worked example loaded.

Every step from survey to switch-on is collected in buying and installing solar panels. If you are still looking for businesses to quote, our installer directory lists Google’s listings near a postcode: Google data, so check MCS status yourself on the register.

Sources

  • Department for Energy Security and Net Zero, Solar PV cost data, 2025/26 edition published 28 May 2026, medians of £1,780 (0 to 4kW) and £1,697 (4 to 10kW) per kilowatt, confirmed against the DNC basis spreadsheet. Checked 2026-10-19, gov.uk.
  • HMRC, VAT on energy-saving materials and heating equipment, Notice 708/6, the zero rate to 31 March 2027. Checked 2026-10-19, gov.uk.
  • Energy Networks Association, Connect my generation, the G98 and G99 routes as cited across this site; the page blocked automated checking on 2026-10-19, so the figures are as previously cited, energynetworks.org.
  • The £2,500 fixed block, the £7,400 quote and the retrofit job are illustrations, labelled as such.