Solar finance
See the monthly repayments and interest on an illustrative loan alongside a saving you supply.
Have ready: Amount borrowed, APR, term and an annual saving to test.
This loan illustration excludes fees and holds savings flat. It is not a lender offer or a custom-APR quote audit.
- The 10% APR is an illustration, not any lender's rate; the article's example is 10% over 10 years.
- Monthly rate is the APR divided by twelve, repaid in equal instalments; interest is spread evenly across the term to set against one year's saving.
- A year one saving of £650, which you set, held flat: no degradation, no inverter replacement, nothing inflated.
- The calculator does this comparison with degradation and replacement included.
Illustrative arithmetic on the inputs shown. For a projection with degradation, replacement and your tariff, use the calculator.
The working
The maths, step by step
Understanding this calculation
What the repayment shows
Enter an amount borrowed, an illustrative APR and a term. The calculation uses a monthly rate derived from the APR and equal repayments, then totals the amount repaid and interest.
Actual lender terms, fees, eligibility and repayment schedules may differ. The starting APR is an example, not an offer.
Compare against an entered saving
You can enter an annual solar saving to compare with the loan. The widget holds that saving flat and spreads total interest evenly across the term for its annual illustration.
This is a simplified comparison. It does not model changing solar output or the full timing of each future saving and cost.
Look beyond the monthly figure
Compare the total repayment as well as the monthly amount, and check the consequences of early repayment or missed payments with the lender.
The full ROI calculator uses its own documented model, including equipment replacement and physical degradation. This widget does not replace a finance quote or personal financial advice.
Take the next step
Put solar, battery storage and household use together in the full calculator. Its projection uses the existing calculation engine with tariff, degradation and replacement assumptions.