Solar planning and approvals cost calculator

Add your own planning, connection and professional cost figures.

Your situation

Your entered amountsUse zero for an item that does not apply. Confirm requirements and amounts with the relevant authority and professionals.

Avoid counting amounts already included in another item or your installation quote.

Calculated from your figures

£0.00 entered approval costs

What this means

Only the amounts entered are included. This does not determine required approvals or fees.

The working

The maths, step by step

entered total (£)=0+0+0+0+0=0\text{entered total (£)} = 0 + 0 + 0 + 0 + 0 = 0

A zero value means no cost was entered, not that an approval or fee is unnecessary.

Understand your result

A closer look at the calculation

The context behind the numbers, so you can decide what to check next.

Build a cost checklist

This worksheet adds amounts you enter for planning, building control, network connection, professional surveys and other approval-related work. Every field starts at zero so that no invented local fee is implied.

Zero means no amount has been entered. It does not mean that permission, notification, professional work or a fee is unnecessary. Confirm the applicable requirements and costs for your installation.

Planning and building considerations

Some domestic solar installations can qualify for permitted development subject to conditions, but circumstances such as the property, location and proposed work matter. Rules and application processes differ across the UK and may change.

Check with the relevant planning authority and building control body, especially for listed buildings, conservation areas, structural changes or unusual installations. A lawful development certificate, where relevant, is a separate decision from permission.

Network connection and quotes

Grid-connected generation can require notification or approval from the distribution network operator. Ask the installer which process applies and whether any application or connection charges are included in the quote.

Use figures from the authority, network operator and professionals. Avoid counting fees already included in the installation price, and keep VAT treatment consistent. This worksheet does not decide eligibility, provide a current fee schedule or replace professional advice.

Take it further

Solar and battery ROI calculator

You know what fits. Now see whether it pays back.

The ROI calculator takes a roof direction and system size and models generation, self-consumption, export income and replacements, all in today's prices.

Open the ROI calculator

Before you rely on this

Add your own planning, connection and professional cost figures.

  • All fees and professional costs are entered by the user and are counted once on a consistent VAT basis.
  • The worksheet does not determine permission, notification, local fees or US permit requirements.

Reference sources

Calculated results show their method version, assumptions and any data sources under "How this was calculated". Example starting figures are illustrations, not measurements.

Common questions

Does this decide whether I need planning permission?

No. Planning depends on the location, property and proposal. Check current requirements with the relevant authority.

Why do all fields start at zero?

Fees and professional costs depend on the project. Zero is an empty starting assumption, not confirmation that no fee or approval is needed.

Does planning permission cover the network connection?

They are separate matters. Ask the installer and distribution network operator about notification or approval for the connection.

Does the total include my installation quote?

Only amounts you enter are added. Avoid entering a fee twice if it is already included in another quote.