How to sell electricity back to the grid

What you need in place, who pays, how the money reaches you, and what each month of delay costs on a typical array.

12 min readreference
Illustration accompanying How to sell electricity back to the grid

You do not sell electricity back so much as get paid for what you export. The mechanics matter, because several things have to be in place before any money moves, and none of them happen automatically.

The framework is the Smart Export Guarantee: suppliers with 150,000 or more domestic customers must offer an export tariff, Ofgem says the rate “must always be above zero”, and everything else, the rate, the conditions, the paperwork, is between you and the supplier you choose. Here is what is required, in the order you need it.

What you need in place

These are the requirements as the official pages state them, read on 20 October 2026.

RequirementWhat it meansSource
An eligible installationSolar PV, wind, hydro or anaerobic digestion up to 5 MW, or micro-CHP up to 50 kW, located in Great BritainOfgem
CertificationInstallation and installer certified through MCS “or a scheme accredited as equivalent”GOV.UK
A meter that reads export half-hourlyTypically a smart meter; payments are based on metered exportGOV.UK
An export MPANA 13 digit reference, different from your import MPAN; the export supplier provides itOfgem guidance
No Feed-in Tariff export paymentsYou cannot take SEG and FIT export payments at the same timeGOV.UK
An applicationYou apply directly to a SEG tariff supplier; nothing is automaticGOV.UK

Three of those catch people out.

Certification. MCS registration for the installation and installer, or an equivalent, is how the supplier establishes that the system is what you say it is. Without it, a supplier has no obligation to register you, which is why an uncertified installation quietly removes a few hundred pounds a year from the projected return, permanently.

The meter. You are paid for metered export, not for an estimate. If your meter cannot report export half-hourly, it will need replacing or reconfiguring, arranged through your supplier.

The application. Having panels and a smart meter does not enrol you in anything. You have to apply.

One geographic caveat: the scheme covers Great Britain. Northern Ireland works differently, with voluntary supplier tariffs instead of an obligation.

Applying is your job

Not your installer’s, though a good one will remind you at handover.

You apply to a supplier offering an export tariff, providing your certificate, your meter details and your bank details. Ofgem’s guidance says that once the application is reviewed and the installation found eligible, the supplier gives you written confirmation of the terms, and that confirmation is the contract under which payments are made. Until it exists, your surplus goes to the grid and earns you nothing.

A worked household: the cost of waiting

A 4 kW south facing array generating 3,400 kWh a year at the site model’s 850 per kilowatt, with 40% used at home and 2,040 kWh exported.

So every month unregistered gives away about £20 on average, and more than that in summer, when most of the export happens. A three month delay over the first summer is not a rounding error: at an average month it is about £61, and the summer months are above average. Households have gone a year exporting for free because everyone assumed someone else had arranged it. Apply in the week the system is commissioned, and ask the supplier from what date its contract pays.

Your export supplier need not be your import supplier

This is worth money and is routinely missed. GOV.UK puts it plainly: your SEG tariff supplier “does not need to be the same as the supplier that provides your energy”. Ofgem adds the one limit: one SEG licensee at a time.

You can buy your electricity from whoever is cheapest and take your export tariff from whoever pays most. They are separate arrangements, and the spread is real: the same supplier pays 4.1p on its open tariff and 12p on its conditional one, nearly three times as much for the same electrons. On the worked household that is about £245 against £84.

The complication is that the best rates are conditional on importing from the same supplier. Those offers have to be judged as a package:

  1. Annual export multiplied by the conditional export rate, minus annual import multiplied by that supplier’s import rate.
  2. Against annual export at the best independent rate, minus annual import at the cheapest tariff you could otherwise get.

Most households import several times more than they export by volume, so a modest penalty on the import side can swallow a generous export rate: the worked comparisons show a conditional offer winning by about £39 for one household and by over £200 for another, on the same tariffs. Run your own volumes rather than assuming the bigger export figure wins.

A second household: the big array, the small bill

A 6 kW array generating about 5,100 kWh, on a household that uses only 30% of it: 1,530 kWh used, 3,570 kWh exported. Here the export line is the larger half of the return. At 12p it is about £428 a year; at 4.1p about £146; the gap between the two tiers is about £282 a year. For this household the export tariff is a decision worth an evening’s research, and the question of how the money arrives, covered below, matters as much as the rate.

Fixed or tracking

Fixed pays the same per unit whenever you export. Predictable and easy to model.

Tracking follows wholesale prices through the day. It can pay considerably more at times of high demand and very little when generation is abundant, which often means the sunny afternoons when you have most to sell. The pairing that makes tracking genuinely strong is a battery holding export back for the evening peak; without one, model it against your real export profile, not its headline rate.

One caution for battery owners: Ofgem’s guidance says that where the export meter also records electricity from a battery charged from the grid, the supplier is not obliged to pay SEG on it, though it may, and suppliers handle it differently. Ask before you plan to sell stored grid electricity back.

How the money arrives

Usually as credit against your electricity bill rather than as cash, though some suppliers pay out. Payments are typically monthly or quarterly, based on metered readings.

Check what happens if your export credit exceeds your import cost. Some suppliers roll it forward indefinitely; others will pay out on request. It matters for a household like the big-array one above, where the export line is hundreds of pounds a year that you would presumably like as money rather than as an ever-growing number on a statement.

The registration itself, step by step

The application is genuinely short once the pieces exist:

  1. The MCS certificate number, from the handover pack.
  2. Your import MPAN, the 13 digit number on your electricity bill, so the supplier can find your supply; the export MPAN is separate and the export supplier arranges it.
  3. Your meter serial number.
  4. Confirmation the meter reports half-hourly export, which the supplier can usually check remotely.
  5. Bank details, if the tariff pays cash rather than bill credit.

Two snags account for most delays: a certificate that never arrived from the installer, worth chasing the week of commissioning, and a meter that turns out not to be reporting export, worth resolving before the application rather than during it. Neither snag improves with age, and both are cheaper to fix while the installer still answers the phone.

If something goes wrong with the supplier afterwards, Ofgem’s guidance sets the route: complain to the supplier first, and if there is no satisfactory answer after eight weeks, the complaint can go to the Energy Ombudsman.

What the quote will say

Earn hundreds of pounds a year selling your surplus back to the grid.

On the worked 4 kW household that is true at 12p, about £245, and not at the open 4.1p, about £84. Ask which export rate the figure assumes, whether that rate needs you to import from a particular supplier, and what share of generation the installer assumed you export. A higher assumed export share makes the export line bigger and the whole return smaller, because each exported unit is worth less than half a used one.

The thing worth remembering

Export is the backstop, not the return.

A unit you use yourself saves 26.32p. A unit you export earns 12p at best on the rates above. Everything sensible about running a system follows from that gap of about 14.3p: shift loads into daylight, divert to hot water, then consider storage, in that order of cost. On the worked household, moving 500 kWh from export into use is worth about £72 a year; a 2p better export rate on all 2,040 exported units is worth about £41. The widget runs both on your own figures.

Try the numbersA unit used against a unit sold
3,400 kWh
40%
500 kWh
Used at home, 1,360 kWh
£358
Exported, 2,040 kWh
£245
A 2p better export rate is worth
£41 a year
Moving 500 kWh into daylight is worth
£72 a year
The units used at home are worth £358 a year and the units exported £245.The units used at home are worth £358 a year and the units exported £245. Values: Used: Pounds a year £358; Exported: Pounds a year £245.£358Used£245Exported
  • Used at home
  • Other bars
Assumptions
  • Import at 26.32p, the Ofgem price cap unit rate (Ofgem cap, 1 October to 31 December 2026); export at the rate selected, from the Octopus SEG page (checked 2026-10-19).
  • The gap between the two rates is 14.32p: what every kilowatt hour moved from export to use is worth. A 2p better export rate is the article's comparison, applied to the units still exported.
  • Generation and the share used are yours to set; the shift is capped at what is exported. Year one, nothing inflated.

Illustrative arithmetic on the inputs shown. For a projection with degradation, replacement and your tariff, use the calculator.

Questions people ask

Can I sell electricity back to the grid without a smart meter?

Not under the Smart Export Guarantee: GOV.UK says you must have a meter capable of half-hourly export readings, which is typically a smart meter. Ask your supplier to fit or reconfigure one before you apply, because the export tariff pays on metered units only and a month without a working meter is a month of about £20 on the worked household.

Do I get paid for electricity I use myself?

No. GOV.UK states that you are paid for every unit you feed back and not for any you use yourself. The used units are worth more anyway: each saves the 26.32p import rate against 12p at best for an exported one, which is why raising self-consumption comes before chasing export rates.

I am on the Feed-in Tariff. Can I switch to SEG?

Only the export part. You cannot receive a SEG tariff while you are receiving Feed-in Tariff export payments, but Ofgem’s guidance says an installation that keeps FIT generation payments and opts out of FIT export can receive a SEG export tariff. So the generation payments stay either way, and the comparison is the FIT export payment you receive now against a SEG rate on your own metered export: keep whichever pays more, and check your FIT terms with your licensee before opting out.

What if my supplier refuses to register me?

Check the eligibility list first: certification, metering, and location in Great Britain. If all three are in order, use the supplier’s complaints process; after eight weeks without a satisfactory answer, Ofgem’s guidance says the complaint can go to the Energy Ombudsman. You can also simply apply elsewhere, since any obliged supplier must offer a tariff.

Check your own numbers

Get the export tariff arranged in week one, because leaving it unclaimed is giving money away. Then spend your attention on using more of what you generate, which is where the larger number is. The calculator splits generation into used and exported units at your occupancy, prices each at its own rate, and runs the projection in today’s money. Start from the worked household and change the occupancy to match yours: open the calculator with the worked example loaded.

Everything else on export rates and tariffs is in solar tariffs and export payments explained.

Sources

  • Ofgem, Smart Export Guarantee (SEG): eligible technologies, up to 5 MW or 50 kW for micro-CHP, installations in Great Britain, rates “must always be above zero”. Checked 2026-10-20, ofgem.gov.uk.
  • Ofgem, SEG licensed suppliers: the 150,000 customer threshold. Checked 2026-10-19, ofgem.gov.uk.
  • GOV.UK, Smart Export Guarantee: MCS or equivalent certification, half-hourly export meter, applying directly to a SEG supplier, export supplier need not be the import supplier, no SEG alongside FIT export payments, no payment for units used. Checked 2026-10-20, gov.uk.
  • Ofgem, SEG: Guidance for Generators, December 2019: FIT generation payments alongside a SEG tariff (paragraph 1.28), the export MPAN, one SEG licensee at a time, written confirmation as the contract, battery export from a non-eligible source, the eight week complaints route to the Energy Ombudsman. Checked 2026-10-20, ofgem.gov.uk.
  • Octopus Energy, Smart Export Guarantee: Outgoing at 12p and the open SEG rate at 4.1p. Checked 2026-10-19, octopus.energy.
  • Ofgem, Changes to the energy price cap between 1 October and 31 December 2026: 26.32p per kWh. Checked 2026-10-20, ofgem.gov.uk.
  • gowith.solar, What the calculator models, for the 850 kWh per kilowatt figure, what the calculator models.
  • The two households, the shares used at home, the three month delay and the quote box are illustrations, labelled as such.