Home batteries are safe when they are the right chemistry, properly installed and sensibly sited. Since March 2024 there has been a published British Standards Institution specification saying exactly what “sensibly sited” means, and an installer who has never heard of it is the actual risk.

The standard, by name

The document is PAS 63100:2024, the BSI specification for fire protection of battery energy storage systems in dwellings, published on 20 March 2024 and downloadable from BSI’s site. It is a publicly available specification rather than a British Standard, and its standing is worth stating precisely, because installers sometimes overstate it in one direction and sometimes ignore it in the other.

MCS said in May 2024 that the PAS “has no current standing in any UK regulations (such as Building Regulations)” and is not directly referenced in its battery installation standard, MIS 3012. But MIS 3012 does refer to the latest edition of the IET Code of Practice for electrical energy storage, and that Code says PAS 63100 “should be used” on battery location. So for an MCS installer the siting rules arrive by reference, one step removed, and they are concrete:

  • Batteries should not be installed in voids, roof spaces or lofts.
  • They should not sit in escape routes: landings, staircases, corridors.
  • Locations, detection and separation from combustibles are all specified rather than left to judgement.

The practical consequence for buyers: “where will it go, and does that comply with PAS 63100” is now a question with a checkable answer, and the loft, long the default suggestion for tidy installations, is the wrong answer.

Where the specification says a battery should not go

The PAS itself is the authority; the list below is as reported by Marley, the roofing manufacturer, in a summary of the document’s location clauses, with clause numbers where that summary gives them. Check the current edition before relying on any single line, because the government has commissioned a review (below).

LocationPosition in PAS 63100:2024Checked on
Voids, roof spaces or loftsExcluded2026-10-20
Rooms where people are intended to sleepExcluded2026-10-20
Escape routes that are not protected, including landings, staircases and corridorsExcluded2026-10-20
Corridors, shafts, stairs or lobbies of protected escape routesExcluded2026-10-20
Cupboards or spaces opening into a bedroomExcluded2026-10-20
Cellars or basements with no access to the outsideExcluded2026-10-20
Within 2m of stored flammable materials or fuel tanksExcluded2026-10-20
Outdoors within 1m of escape routes, doors, windows or ventilation portsExcluded2026-10-20
Outdoors, where practicablePreferred (clause 6.5.1)2026-10-20
A rarely visited location such as a store cupboardAllowed with a smoke or multi-sensor alarm to BS 5839-6 (clause 6.5.6)2026-10-20

Two things in that table catch people out. The garage is not automatically fine: a garage with a fuel can or a paint shelf within two metres of the wall is outside the specification until the storage moves. And an outdoor enclosure is not automatically fine either: under a bedroom window, or beside the back door, fails the one metre rule.

Chemistry first

Most current home batteries use lithium iron phosphate. It has a higher thermal runaway threshold than the nickel-based lithium chemistries used in many electric vehicles and older storage products, and it behaves less energetically if it does fail.

The trade is slightly lower energy density, which for a wall-mounted unit in a garage rarely matters.

If a quote specifies something else, ask why. There can be good reasons, and it should be a deliberate choice rather than whatever was in the warehouse.

Where it goes

Siting is the decision with the most influence on safety and on lifespan, and the specification now does most of the arguing for you.

Cool and ventilated. Heat accelerates degradation and is the enemy in a failure. A garage, a utility room or an external wall in shade beats the loft on every axis, and the loft is ruled out anyway.

Not in an escape route. Specified, not preferential.

Not in or opening into a bedroom. Also specified.

Away from combustible storage. Two metres, on the summary above. A garage full of paint and petrol cans is a worse location than an empty one, and a non-compliant one until it is cleared.

Accessible. For maintenance, and for isolation in an emergency.

If an installer proposes a non-compliant location, the conversation is simple now: name the PAS and ask them to design to it. A warranty claim can also be refused on operating-temperature grounds, which tells you the manufacturers take siting as seriously as the specification does.

What else the rules require

The battery product itself should be certified to the relevant product safety standards, and the installation falls under the wiring regulations and building regulations, with the electrical work notifiable like any other significant addition.

The battery management system is the main protective layer: it monitors cell voltages and temperatures, and shuts down outside safe bounds. That is why professional installation and manufacturer-approved configuration matter, and why the certification conversation covers storage as its own technology rather than riding along with the panels.

Questions to ask

  • What chemistry is this, and why?
  • Where are you proposing to site it, and does that location comply with PAS 63100?
  • What is the specified operating temperature range, and what does the proposed location reach in summer?
  • What standards is the product certified to, and the installation carried out to?
  • How is it isolated in an emergency, and where is that isolator?
  • Does anything need to be labelled for the fire service?

That last one is worth asking. Attending crews benefit from knowing there is stored energy on the premises and where to isolate it.

What the quote will say

Battery to be neatly installed in the loft, out of sight and out of the way, with all cabling concealed.

Tidy is not the test. Reply asking for the location to be confirmed against PAS 63100 in writing, and for an alternative: an external wall in shade, a garage wall at least two metres from any fuel or paint, or a utility room that does not open into a bedroom. If the only location the installer will consider is the loft, that is the answer to whether they know the specification, and a reason to get another quote.

Retrofitting compliance to an existing installation

If your battery predates the 2024 specification, nothing obliges you to move it, and the gap between where it is and where the specification would put it is still worth an honest look. A loft unit is the common case: it sits outside the specified locations, in the hottest space the house has, which is also the siting most likely to breach its warranty’s operating-temperature terms.

Relocation is an electrician’s day rather than a rebuild: new mounting, extended DC or AC runs, and recommissioning. Whether it is worth doing depends on the unit’s age and value, but two occasions make the decision for you: any other electrical work that already opens the consumer unit, and any house sale, where a buyer’s surveyor reading the current specification against a loft battery becomes your problem at the worst moment. Ask an installer to quote the move as part of the next job that touches the system, when the fixed costs are already being paid.

Tell people

Your insurer. Most policies require notification of material alterations. Some insurers ask about chemistry and location. Non-disclosure can affect any claim, not just one involving the battery.

Your household. Everyone should know where the isolator is and that the unit should not be tampered with or stacked against.

Second-life and self-assembled batteries

Worth being direct about.

Batteries assembled from salvaged cells, or repurposed vehicle modules, appear online at attractive prices. They are generally not certified for domestic installation, they may lack a proper management system, and cell provenance is unknown. Second-life batteries sit outside the scope of PAS 63100 altogether, so there is no specification to install them to, they may not be covered by your insurance, and they are the category where the genuine incidents cluster.

If the price is a large fraction below the going per-usable-kilowatt-hour market, that is the reason.

Questions people ask

Not directly. MCS stated in May 2024 that it has no standing in any UK regulations, Building Regulations included. It reaches certified installers through the IET Code of Practice for electrical energy storage, which says the PAS “should be used” for battery location, and MCS’s battery standard refers to that Code. In practice an MCS installer who sites against it needs a reason, and a buyer is entitled to ask what the reason is.

Can a battery go in an integral garage?

Often, and it is one of the commonest compliant locations, subject to the separation rule: two metres from stored flammable materials and fuel tanks or cylinders, on the published summary of the PAS. Clear the shelf, keep the car’s spare fuel elsewhere, and keep the unit off the wall shared with a bedroom. Heat matters for battery life as well, so a cool garage wall beats a sunny one.

Does a battery need its own smoke alarm?

Where it is in a location that is not frequently visited, such as a store cupboard, the PAS calls for a smoke alarm or multi-sensor fire alarm conforming to BS 5839-6 in that location, under clause 6.5.6 as summarised. In a garage or utility room people pass daily it may not apply, but an alarm is cheap relative to the battery and worth adding regardless.

Is the specification about to change?

Possibly. The Department for Energy Security and Net Zero published a contract award notice on 28 July 2026 for the amendment and review of PAS 63100, run through BSI’s processes. Until a revised edition is published, the 2024 text is the one to design to, and the loft exclusion is the line least likely to soften.

Check your own numbers

Safety decides where a battery goes; it does not decide whether one is worth buying. That depends on how much surplus you generate, how much you use in the evening, and the gap between your import and export rates, which the battery sizing guide works through. As a starting point, a 4kW south-facing array with a 5kWh battery for a household using about 4,000 kilowatt hours a year, mostly out in the day, an illustration rather than a typical figure, is loaded here: open the calculator with a battery included.

In proportion

Serious incidents involving certified, professionally installed domestic storage are rare. The technology is well understood, the protective systems work, and the publication of a specific dwelling specification is the system maturing, not a signal of danger.

The risk is concentrated in uncertified equipment, self-installation, and poor siting. All three are avoidable, the specification now removes the ambiguity that used to excuse the third, and asking the six questions above avoids them all.

Sources

  • BSI, PAS 63100:2024, Electrical installations. Protection against fire of battery energy storage systems for use in dwellings. Specification: published 20 March 2024, scope and exclusions including second-life batteries. Checked 2026-10-20, knowledge.bsigroup.com.
  • MCS, Update on PAS 63100 and IET Code of Practice 3rd Edition, 9 May 2024: no standing in UK regulations, not directly referenced in MIS 3012, IET Code sections 11.2.2 and 11.2.3. Checked 2026-10-20, mcscertified.com.
  • Marley, PAS 63100: best practice for residential solar battery storage placement, 1 July 2024: the location list, the 1m and 2m distances and clauses 6.5.1 and 6.5.6, as summarised there. Checked 2026-10-20, marley.co.uk.
  • Find a Tender, Public Available Specification (PAS) 63100 Amendment and Review, Department for Energy Security and Net Zero, award notice published 28 July 2026. Checked 2026-10-20, find-tender.service.gov.uk.
  • Planning Portal, solar panels and building regulations. Checked 2026-10-20, planningportal.co.uk.
  • The quote line and the 4,000 kWh household are illustrations, labelled as such.